1992 Newly Enlarged Blackford Hall

Although the new additions more than doubled the size of Blackford Hall, consideration was given to maintaining the classic design of the building. It was important that “the old Blackford” continue to be recognizable to those who had attended meetings and courses at the Lab in its earlier years. The expansion was completed in two years and a rededication celebration was held on March 2, 1993.

The former assembly room was dedicated to Efraim Racker, an Austrian scientist and artist who isolated ATP synthase. He spent summers at CSHL working on enzymology and making drawings of his fellow researchers.

spacer

Blackford Hall
Gallery

1907Blackford
Beginnings
1907Structural
Elements
1907Assembly
Room
1930sFirst
Symposium
1940sSymposium
Meeting
1973Winterization
1990Major
Expansion
1992Expansion
Complete
2005Summertime
2022Exterior
spacer

Copyright © 2006 Cold Spring Harbor Laboratory. All rights reserved.
CSHL Library and Archives, 1 Bungtown Rd., Cold Spring Harbor, NY 11724
Library Information 516-367-6872
spacer
spacer