The circa 1905 Blackford Hall has been in continuous operation for more than a century and structural cracks and spalling in the poured concrete structure were evident. It was necessary to repair and stabilize the building to prevent further decay. Of particular concern was preserving the historic nature of the building while conserving the relatively thin four-inch thick concrete walls. The project was completed in 2012 with the building remaining in full operation.
|