Plans for Sambrook Laboratory Construction Begins, 1981

The plans for a large addition to James Laboratory began in 1981. At that time, research on oncogenes using monoclonal antibody technology, gene expression, and transgenic experiments with mice were all being conducted at James Lab. To provide the space needed to expand these promising programs, a new laboratory was constructed. Funding was obtained through grants from major foundations, including the National Cancer Institute, the Pew Charitable Trust, and the Fannie E. Rippel Foundation. Completed in 1985, it was named the Sambrook Laboratory to honor Dr. Joseph Sambrook. Designed by Centerbrook Architects, the new three-story addition on the north side of the James building continued the vertical board sheathing exterior style.

spacer

Sambrook Laboratory
Gallery

1929Biophysics
at BioLab
1961James
Additions
1981Sambrook
Construction
1985Sambrook
Dedication
1985Sambrook
Dedication
2012James-
Sambrook
Complex
spacer

Copyright © 2006 Cold Spring Harbor Laboratory. All rights reserved.
CSHL Library and Archives, 1 Bungtown Rd., Cold Spring Harbor, NY 11724
Library Information 516-367-6872
spacer
spacer